Must-have view for scheduled loads. Lists every load marked Scheduled to Ship and the trailers on it that aren't finished or are on a yellow-tag hold, with the date each must be done — at least one production day before the ship date (Mon–Thu week). Stage comes from each trailer's current routing operation; the raw operation is always shown beneath the stage badge.